Examples Library
38 ready-to-run processes
Four tutorials, plus 34 models that reproduce published techno-economic studies. Each example shows the study it reproduces and its headline figures, and a comparison document lists every calibration and assumption.
Biopharmaceuticals & nutraceuticals 6
Antibody-drug conjugate, continuous mAb with perfusion and PCC capture, polysaccharide vaccine, semaglutide API, vitamin B12 and retinol by precision fermentation.
PerfusionPCCSingle-useFed-batch
Food & nutrition 8
Cultured meat, mycoprotein, cricket protein, recombinant egg-white protein, bio-collagen, cocoa butter equivalent, tequila from agave, and pectin from citrus peel.
ChemostatBatch distillationDrying
Chemicals 8
Aspirin, erythritol, isobutanol from corn stover, malonic acid (two studies), formic acid from CO₂ (two studies) and vitamin C by two-step fermentation.
KineticsRigorous columnsElectrodialysis
Starch & sweeteners 7
Glucose and high-maltose syrups from wet and dry starch, HFCS 42, spray-dried sorbitol and maltitol, imported from the SWEET project's published process models. Main-product flows agree within 0.05 %.
Ion exchangeSMBHydrogenation
Materials & environmental 5
Cellulose nanocrystals, a kraft pulp and tissue mill, lithium carbonate from geothermal brine, a microalgal biostimulant from wastewater, and PHA in a photobiorefinery.
CHPCrystallisationWastewater
Within about 10 %
Most examples come within about 10 % of the published production, capital, operating cost and unit cost. The misses are documented and explained.
See the comparison tables
Plus four tutorials: Getting Started, Recombinant Enzyme, API Intermediate and Bioethanol Recovery.